CIVIL SITE DESIGN ENGINEERING AND ENVIRONMENTAL SERVICES FOR THE SMUD, UPPER AMERICAN RIVER PROJECT CULVERT SYSTEM UPSIZING
   

Closed
1
Q&A
CIVIL SITE DESIGN ENGINEERING AND ENVIRONMENTAL SERVICES FOR THE SMUD, UPPER AMERICAN RIVER PROJECT ...
Sacramento Municipal Utility District
Loading...
Posted On:  24 Aug 2021
Open for bidding on:  24 Aug 2021
Response Deadline:  27 Sep 2021 5:00 PM PDT
Not Interested
 | 
Share:
Opportunity Amount: $100K to $500K USD
Contract Length: 36 months
Response Deadline: 27 Sep 2021 5:00 PM PDT
(Closed for response)
Award Date: 1 Nov 2021
Posting ID: 11055283(Doc3129489330)
Posting Type: Request for Quotation
Public Posting: https://discovery.ariba.com/rfx/11055283
Product and Service Categories 
  • Architectural engineering
  • Structural engineering
  • Highway engineering
  • Dam engineering
  • Well engineering
Ship-to or Service Locations
Posting Summary
SMUD has applied to the FEMA Hazardous Mitigation Grant Program for the upsizing of culverts since a nationally declared emergency from the storms in the winter of 2017.  During those storms it was apparent that there were a number of culverts throughout the UARP that were susceptible to damage and overtopping during extreme flows.  A number of these culverts were also identified for upsizing prior to 2017 during FERC Relicense negotiations.  The objective of this project is to bring a number of the identified culverts and arch culverts up to a condition in which they could tolerate 100-year flow projections.