RFP - UARP Reservoir Project Wildfire Risk Reduction
   

Closed
0
Q&A
RFP - UARP Reservoir Project Wildfire Risk Reduction
Sacramento Municipal Utility District
Loading...
Posted On:  14 Sep 2021
Open for bidding on:  14 Sep 2021
Response Deadline:  11 Oct 2021 11:59 PM PDT
Not Interested
 | 
Share:
Opportunity Amount: $4,000,000.00 to $4,800,000.00 USD
Contract Length: 36 months
Response Deadline: 11 Oct 2021 11:59 PM PDT
(Closed for response)
Award Date: 15 Nov 2021
Posting ID: 11210488(Doc3157055787)
Posting Type: Request for Information
Public Posting: https://discovery.ariba.com/rfx/11210488
Product and Service Categories 
  • Tree trimming services
Ship-to or Service Locations
Posting Summary

DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON APPROX. SEPT. 15, 2021.


Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents.


Scope: The purpose of this contract is to supply construction services to perform Vegetation Management in the SMUD Transmission Right of Way (ROW).  The Vegetation Management support services are directly related to clearance for electric conductors transporting electricity at voltages up to 230kV through the course of the required work.  Most of the work consist of mastication on uneven terrain, along with selective tree removal/felling services.  The work is further described in the Special and Technical Conditions.


The SMUD Reservoir Project is Located adjacent to Union Valley Reservoir on the El Dorado National Forest, in El Dorado County. The work involves the removal of approximately 5000 trees, 100 brush units, and the chipping and/or mastication of resulting slash and debris; merchantable logs will be skidded to designated landings approved by the USFS. The work will take place along the Loon Lake Union Valley / Robbs Peak Union Valley 69kv transmission line.  