UARP Switchgear Replacements
   

Closed
11
Q&A
UARP Switchgear Replacements
Sacramento Municipal Utility District
Loading...
Posted On:  15 Sep 2021
Open for bidding on:  15 Sep 2021
Response Deadline:  3 Nov 2021 2:00 PM PDT
Not Interested
 | 
Share:
Opportunity Amount: $1,500,000.00 USD
Contract Length: 12 months
Response Deadline: 3 Nov 2021 2:00 PM PDT
(Closed for response)
Award Date: 15 Nov 2021
Posting ID: 11217796(Doc3140739506)
Posting Type: Request for Information
Public Posting: https://discovery.ariba.com/rfx/11217796
Product and Service Categories 
  • Switchgear systems
  • Medium voltage switchgear
  • Substation load control switchgears
Ship-to or Service Locations
Posting Summary
** Documents will be available to download on Monday, 9/20 **

SMUD is requesting bids to establish a contract with a single switchgear supplier to support SMUD personnel in the design, manufacturing, testing, and delivery of replacement switchgear assemblies at Robbs Peak, Union Valley and Loon Lake powerhouses. Design of the switchgears is anticipated to begin in quarter 4 2021 and delivery will take place at mid-year 2022 for all facilities. SMUD will install the replacement switchgears at these facilities in Fall 2022 and Fall 2023.  

  

The principal objective of this procurement is the vendor’s ability to deliver quality switchgear assemblies to SMUD in an expeditious and efficient manner at the most economical overall cost to SMUD.    