HYDRO TURBINE MACHINING SERVICES FOR THE UPPER AMERICAN RIVER PROJECT
   

Closed
1
Q&A
HYDRO TURBINE MACHINING SERVICES FOR THE UPPER AMERICAN RIVER PROJECT
Sacramento Municipal Utility District
Loading...
Posted On:  14 Apr 2022
Open for bidding on:  14 Apr 2022
Response Deadline:  13 May 2022 5:00 PM PDT
Not Interested
 | 
Share:
Opportunity Amount: $1M to $5M USD
Contract Length: 36 months
Response Deadline: 13 May 2022 5:00 PM PDT
(Closed for response)
Award Date: 1 Aug 2022
Posting ID: 12806176(Doc3451927359)
Posting Type: Request for Information
Public Posting: https://discovery.ariba.com/rfx/12806176
Product and Service Categories  (8)
  • Casting machines
  • Tapping machine attachment
  • Beveling machine
  • Lapping machine
  • Chamfering machine
Ship-to or Service Locations
Posting Summary
*DOCUMENTS TO BE MADE AVAILABLE 4/18 @ 8 am*


The Sacramento Municipal Utility District (SMUD) owns and operates a 688 MW hydroelectric system located on the West Slope of the Sierra Nevada Mountain Range, located in El Dorado County, California.  This system includes twelve (12) hydroelectric units located at nine (9) separate powerhouse locations.  This system also includes a series of dams, reservoirs, and conveyances and is referred to as the Upper American River Project (UARP).  
The purpose of this Request for Proposal (RFP) is to solicit a proposal for a long-term Hydro Turbine Machine Services Agreement (MSA) for the repair, refurbishment, or overhaul of hydro turbine and generator mechanical components of SMUD’s hydroelectric units that make up the UARP.  The work will be on an as-needed basis and requests for services will be issued as written Task Orders.

Questions & Answers
Data Policy Security Disclosure Terms of Use © 1996–2019 Ariba, Inc. All rights reserved.