Event Cancelled   Lake Forest / Truxel Substations Upgrade
   

Closed
2
Q&A
Event Cancelled Lake Forest / Truxel Substations Upgrade
Sacramento Municipal Utility District
Loading...
Posted On:  8 Sep 2020
Open for bidding on:  8 Sep 2020
Response Deadline:  24 Sep 2020 11:59 PM PDT
Not Interested
 | 
Share:
Opportunity Amount: $1M to $5M USD
Contract Length: 3 months
Response Deadline: 24 Sep 2020 11:59 PM PDT
(Closed for response)
Award Date: 9 Oct 2020
Posting ID: 8895036(Doc2593021138)
Posting Type: Request for Information
Public Posting: https://discovery.ariba.com/rfx/8895036
Product and Service Categories 
  • Electric power systems installation or service
Ship-to or Service Locations
Preference for Sellers
  • Location: Sellers with physical presence in locations specified
Posting Summary

This event has been cancelled.

The Contract work generally consists of furnishing and removing temporary improvements to prevent tire tracking from the site. Clearing and removing existing site organic material and disposal.  Preparation of subgrade.  Site fill and grading. Trenching and backfilling.  Furnishing and placing aggregate base, crushed rock and asphalt pavement.  Furnishing and installing conduits. Furnishing and installing grounding including ground wells. Demolishing and disposing existing concrete structures, underground utilities, conduits, grounding and oil tanks. Construction of concrete structures and foundations.  Furnishing and installing tread plates.  Furnishing and installing electric sump pumps, piping, control panels and supports.  Furnishing and installing underground utility boxes and UG drainpipes and trench drains. Furnishing and installing imbedded angles and grating supports.   

Questions & Answers
Data Policy Security Disclosure Terms of Use © 1996–2019 Ariba, Inc. All rights reserved.