Transmission Pole Corrosion Mitigation RFP
   

Closed
3
Q&A
Transmission Pole Corrosion Mitigation RFP
Sacramento Municipal Utility District
Loading...
Posted On:  21 Feb 2024
Open for bidding on:  21 Feb 2024
Response Deadline:  17 Apr 2024 1:00 PM PDT
Not Interested
 | 
Share:
Opportunity Amount: $1,400,000.00 to $1,900,000.00 USD
Contract Length: 24 months
Response Deadline: 17 Apr 2024 1:00 PM PDT
(Closed for response)
Award Date: 8 May 2024
Posting ID: 18866587(Doc4454279261)
Posting Type: Request for Information
Public Posting: https://discovery.ariba.com/rfx/18866587
Product and Service Categories  (6)
  • Exterior painting services
  • Painting services
  • Rust proofing preparation
  • Industrial or specialized paint application for aircraft or ship or bridge
  • Vehicle body repair or painting services
Ship-to or Service Locations
Posting Summary

o DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON OR ABOUT  March 1, 2024


Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’

SMUD is implementing a two-year Contract to re-coat painted steel pole structures.  SMUD has selected up to 14 transmission line painted steel poles with nominal operational line voltages of 115 and 230 kilo-Volt (kV) phase to phase.  SMUD desires to recoat seven (7) 115kV poles in 2024 and seven (7) 230kV poles in 2025.  The Contractor shall furnish all supervision, labor, materials, equipment, and incidentals necessary to accomplish the Work in accordance with the Contract.