Short-term
1. Concrete repairs of pour strips to eliminate multi-level open spalls, pot holes.
2. Repair and replacement of tee-to-tee shear connectors.
3. Restoration of the two exposed stairs.
Long-term
1. Reconstruction of concrete pour strips.
2. Repair and waterproofing of outside concrete pour strips on multiple levels.
3. Replacement of tee-to-tee shear connections.
4. Strengthening of bowed perimeter load bearing spandrels.
ariba.Input.registerActiveElementId();